Renovation process 2007

  • March 2007 – Wiring was all checked. Coil and Ballast resistor were replaced. {electrical things were not really working right as I was about to find out  in a while}. Steering return pipe replaced. Exhaust tail pipe was patched/repaired where it connected to the muffler. LHM was replaced and filters cleaned.
  • May 2007 – Electrical connections in engine bay all checked and high tension leads replaced. [following sudden break down in the middle of Sydney city traffic and subsequent towing]
  • May 2007 – 6 days later - Ignition was replaced with 123 ignition system
  • December 2007 – Both rear suspension boots and  pivot balls replaced, and knuckles cleaned and regreased and holding pins retensioned.